Loading



The recovery trailer is reversed up to the recovery crate, and pulleys are used to drag the sleeping elephant into the opening. (Prior to this stage of the loading, the elephant is winched up the tilted trailer for transfer to the field crate.)

[CLICK ON IMAGE TO RETURN]